The Kubera Principle

Home GDPR About Contact Terms Policy

Engineering Dubai’s Museum of the Future Updated for 2024

Updated: October 4, 2024

How is Dubai’s Museum of the Future designed, how is it being constructed, and how will it be cleaned? Technology has made it happen.

These questions and more are answered by Tobias Bauly, project director at Buro Happold, in an interview with Oscar Wendel from Trimble Construction Summit Middle East.

The video details the extensive tech-driven design and engineering processes that have contributed to the project’s construction programme, which is being implemented by main contractor BAM International.

The LEED Platinum project is being developed by Meraas and was designed by Killa Design, led by globally renowned architect, Shaun Killa. Buro Happold is delivering lead consulting services for the project.

Watch this video for details of how the project’s structure and façade are being built, as well as how the building will be cleaned and maintained after it opens to the public.

READ MORE:

* Empower to supply cooling to Dubai’s Museum of the Future: https://bit.ly/2NNrw4H

* HH Sheikh Mohammed inaugurates Museum of the Future: https://bit.ly/1PgA5gX

FOOTAGE:
Trimble Construction Summit Middle East

OPENING VISUAL:
ITP Media Group

EDITING:
Neha Bhatia

PRODUCER CONTACT
neha[.]bhatia[@]itp[.]com
https://twitter.com/jaydawt

SUBSCRIBE TO OUR YOUTUBE CHANNEL: https://www.youtube.com/c/constructionweekonlinecom
READ MORE ON OUR WEBSITE: www.constructionweekonline.com
FIND US ON FACEBOOK: https://www.facebook.com/constructionweekonline/
FOLLOW US ON TWITTER: https://twitter.com/cwmiddleeast
TUNE IN TO OUR SOUNDCLOUD STREAM: https://soundcloud.com/constructionweek
FOLLOW US ON INSTAGRAM: https://instagram.com/constructionweek/

© ITP MEDIA GROUP